Doha Metro

Doha Metro

EMPLOYER

Qatar Rails

CONTRACTOR

Fujita Corporation

CONSULTANT

Atkins

COUNTRY

Qatar

SCOPE

Supply, Fabrication & Erection

STEEL TONNAGE

12,000 Ton

Slide 1
Slide 2
Slide 3
Slide 4
Slide 5
Thumb 0
Thumb 1
Thumb 2
Thumb 3
Thumb 4

Doha Metro Phase 1 - Red Line & Green Line - Depots & Stabling Yards

The Doha Metro Phase 1 is an integral part of the Qatar Railway Development Programme.

Phase 1 consists of the design and construction of an operational driverless Metro network with line length of 86.23km, 36 stations of which 35 are fully equipped stations, a main depot and two stabling yards, track work, railway systems and rolling stock.